Bakerloo extension - Lower Sydenham transformed
Bakerloo extension - Lower Sydenham transformed
Full story here
I wonder in what other ways Sydenham will have changed by 2040.
Hope to be around to refer back to this post ...
-
- Posts: 384
- Joined: 28 Oct 2013 17:10
- Location: Trewsbury Road
Re: Bakerloo extension - Lower Sydenham transformed
Is this actually going to go through Lower Sydenham station?
Re: Bakerloo extension - Lower Sydenham transformed
robbieduncan wrote:Is this actually going to go through Lower Sydenham station?
You can see from the map that it does if you can manage to identify Southend Lane, this seems to be the preferred route of the three options that were considered.
http://en.wikipedia.org/wiki/Bakerloo_l ... Camberwell
Re: Bakerloo extension - Lower Sydenham transformed
Looks very much like it to me. If you google it, you'll find plenty of suggested routes, all of which appear to envisage a connection with Lower Sydenham.
Source Forest Hill Society, 2012
AFAIK the map in the OP is the first official suggestion, ahead of an official consultation period. Many groups have been lobbying for this, not least LB Lewisham and the Forest Hill Society.
Source Forest Hill Society, 2012
AFAIK the map in the OP is the first official suggestion, ahead of an official consultation period. Many groups have been lobbying for this, not least LB Lewisham and the Forest Hill Society.
Re: Bakerloo extension - Lower Sydenham transformed
2040. As 65 at present doubt if still around . However good move for the area I guess.
As mainly on existing hayes line track why on earth would it take 26 odd years. I think the Chinese built the Great Wall in less time.
As mainly on existing hayes line track why on earth would it take 26 odd years. I think the Chinese built the Great Wall in less time.
Re: Bakerloo extension - Lower Sydenham transformed
Funding isn't available yet - lots of other improvements, etc in progress before, like Crossrail 2, HS2, etc.
Re: Bakerloo extension - Lower Sydenham transformed
Is funding the constraint, or the supply side - e.g. that there are only so many firms which can manage this sort of project, and currently they are booked up? The UK could easily borrow this amount, and a case be made for the payback in terms of increased economic activity, taxes, etc.JRobinson wrote:Funding isn't available yet - lots of other improvements, etc in progress before, like Crossrail 2, HS2, etc.
Re: Bakerloo extension - Lower Sydenham transformed
There are probably many reasons why it will take at least this long.
Re: Bakerloo extension - Lower Sydenham transformed
Quite. I mean, they managed to build both the Beck Junc-Birkbeck tramline and convert the Overground in a lot less time than that. Wonder whether it will actually go ahead 25 years down the line?Eagle wrote:As mainly on existing hayes line track why on earth would it take 26 odd years. I think the Chinese built the Great Wall in less time.
Re: Bakerloo extension - Lower Sydenham transformed
As usual this unloved part of London never seems to get the necessary upgrades until at least neighbouring SW London gets additional upgrades, despite already having more tube lines in the first place. We get the Overground here so Clapham Junction, Wandsworth Road get an extention too...? Why didn't they focus on this Bakerloo extension first? Clapham Junction et al already have their fair share.
Why do Lewisham, Bromley and Bexley see minimal additions to the tube infrastructure when Merton, Richmond and Wandsworth are already connected? Even at this moment in time it's taking decades to put any project forward that benefits SE London.
Why do Lewisham, Bromley and Bexley see minimal additions to the tube infrastructure when Merton, Richmond and Wandsworth are already connected? Even at this moment in time it's taking decades to put any project forward that benefits SE London.
Re: Bakerloo extension - Lower Sydenham transformed
This is excellent
Re: Bakerloo extension - Lower Sydenham transformed
What - the idea of a Bakerloo line extension, or Parker's account of why SE London gets neglected?Jules wrote:This is excellent
I don't know about the latter, but I wonder if ideological divisions between True Blue Bromley and Labour Lewisham get in the way of the obvious partnership to promote the Bakerloo Line extension with the GLA and HM Treasury.
-
- Posts: 384
- Joined: 28 Oct 2013 17:10
- Location: Trewsbury Road
Re: Bakerloo extension - Lower Sydenham transformed
The consultation has opened: https://consultations.tfl.gov.uk/tube/b ... -extension
One thing I did not realise before ist that if implemented the Bakerloo extension from Lewisham to Hayes would replace the existing national rail lines. Is this is a good thing? I expected this would open Lower Sydenham to more transport choice not less...
One thing I did not realise before ist that if implemented the Bakerloo extension from Lewisham to Hayes would replace the existing national rail lines. Is this is a good thing? I expected this would open Lower Sydenham to more transport choice not less...
Re: Bakerloo extension - Lower Sydenham transformed
What it says is:robbieduncan wrote:The consultation has opened: https://consultations.tfl.gov.uk/tube/b ... -extension
One thing I did not realise before ist that if implemented the Bakerloo extension from Lewisham to Hayes would replace the existing national rail lines. Is this is a good thing? I expected this would open Lower Sydenham to more transport choice not less...
So not exactly less choiceIf the proposed Bakerloo line extension runs as far as Hayes, it would replace the existing National Rail line between Lewisham and Hayes. It would also utilise the current link to Beckenham Junction. A Tube stop at Beckenham Junction would be in addition to the National Rail station at this location.
Currently, six trains per hour use the Hayes line to London Bridge. An extended Bakerloo line to Hayes could mean up to 15 trains per hour could serve this route. It also means that up to 50 per cent more people may be able to use the line to access central London and the Docklands - via DLR at Lewisham
Re: Bakerloo extension - Lower Sydenham transformed
Great prospect but doubt whether I will be around to use it.
It is amazing how infrastructure takes so long in UK. Especially as most on existing track.
It is amazing how infrastructure takes so long in UK. Especially as most on existing track.
-
- Posts: 384
- Joined: 28 Oct 2013 17:10
- Location: Trewsbury Road
Re: Bakerloo extension - Lower Sydenham transformed
Currently you can get a train from Lower Sydenham to Hayes in one direction and Charing Cross or Canon Street in the other. If this goes ahead you will be able to get a tube to Hayes or Lewisham only. Less choice. More frequency but if you want to go into the centre of London you'll have to change at Lewisham. Would be better to integrate the running into the existing services to allow them to be retained.Tim Lund wrote: What it says is:
So not exactly less choiceIf the proposed Bakerloo line extension runs as far as Hayes, it would replace the existing National Rail line between Lewisham and Hayes. It would also utilise the current link to Beckenham Junction. A Tube stop at Beckenham Junction would be in addition to the National Rail station at this location.
Currently, six trains per hour use the Hayes line to London Bridge. An extended Bakerloo line to Hayes could mean up to 15 trains per hour could serve this route. It also means that up to 50 per cent more people may be able to use the line to access central London and the Docklands - via DLR at Lewisham
Edit: before my stupidity is pointed out to me the new trains won't terminate at Lewisham and you'll still be able ot go to Charing Cross, it'll just take longer. So I conceed the point:not really less choice.
Last edited by robbieduncan on 30 Sep 2014 12:40, edited 1 time in total.
Re: Bakerloo extension - Lower Sydenham transformed
It would be good to hear from our local cllrs about this.
I know Liam supports it as he has started a Facebook page supporting the Bakerloo extension.
I've just filled out the consultation. One option is that it stops at Lewisham. I expect ALL our local cllrs to fight for it to come to Lower Sydenham and beyond and not just terminate at Lewisham Station, irrespective of what their party dictates. I know this hasn't always been the case, as with the library.
This is Liams page:
https://www.facebook.com/BakerlooExtension?fref=photo
I know Liam supports it as he has started a Facebook page supporting the Bakerloo extension.
I've just filled out the consultation. One option is that it stops at Lewisham. I expect ALL our local cllrs to fight for it to come to Lower Sydenham and beyond and not just terminate at Lewisham Station, irrespective of what their party dictates. I know this hasn't always been the case, as with the library.
This is Liams page:
https://www.facebook.com/BakerlooExtension?fref=photo
Re: Bakerloo extension - Lower Sydenham transformed
Why would you have to change at Lewisham, Robbie?
-
- Posts: 384
- Joined: 28 Oct 2013 17:10
- Location: Trewsbury Road
Re: Bakerloo extension - Lower Sydenham transformed
See my edit above about my stupidityleenewham wrote:Why would you have to change at Lewisham, Robbie?
Re: Bakerloo extension - Lower Sydenham transformed
I am still at a loss Robbie why it would take longer to Charing X? It goes most of the way on the same track, stopping at the same stations. It would have more modern stock probably improving on timings with regenerative braking and stuff.
Then it goes underground on dedicated twin tracks without being held for traffic crossing or joining the existing track and being 'held' outside London Bridge or awaiting a platform at Charing Cross. Without seeing the 2030 timetable (and more importantly actual performance) I think you are making a long call there.
That's before you take into account the increased frequency means less waiting time. All in all door to door the majority of timings from most points in central London to/from Lower Sydenham are going to be the same or much improved. Yes you may find the odd one at a slight disadvantage but should we let these tails wag the dog?
That's before the better timings for other people in SE London & Kent who can use the capacity donated by this plan.
Stuart
Then it goes underground on dedicated twin tracks without being held for traffic crossing or joining the existing track and being 'held' outside London Bridge or awaiting a platform at Charing Cross. Without seeing the 2030 timetable (and more importantly actual performance) I think you are making a long call there.
That's before you take into account the increased frequency means less waiting time. All in all door to door the majority of timings from most points in central London to/from Lower Sydenham are going to be the same or much improved. Yes you may find the odd one at a slight disadvantage but should we let these tails wag the dog?
That's before the better timings for other people in SE London & Kent who can use the capacity donated by this plan.
Stuart